Schedule & Manpower Tools
    Built for Subcontractors

    Drop in the GC's Primavera P6 or Microsoft Project schedule, pull the activities in your scope by keyword, add your labor hours, and export a manpower-loaded schedule with a manpower curve chart and week-by-week forecast for all your crews.

    DashboardYour workspace at a glance
    Dashboard
    Macro ViewNew project
    Active projects1427 total
    Bidding projects7Actively pursuing
    Crew this week48Across active jobs
    Peak forecast95Active workload high
    Upcoming starts2Future job starts
    Manpower forecastCombined crew over time, active projects only
    Active All trades
    806040200
    SepOctNovDecJan ’27FebMarAprMayJunJulAug
    CarpentersFinishers
    Sep 14, 2026Today onward · Full rangeAug 23, 2027
    Trade movementNow vs. one month out
    TradeNow+1 mo+/−
    Carpenters3857+19
    Finishers1014+4
    Upcoming job starts
    Campus Storage FacilitiesNov 9, 2026
    55 days out
    Jackson County Innovat...Dec 15, 2026
    91 days out
    Projects
    ProjectStartEndCrew curveStatus
    Corporate T.I.Feb 26, 2026Aug 25, 2026Active
    Downtown Data CenterMay 11, 2026Oct 9, 2026Active
    UMKC Hovde HallJul 23, 2024Mar 20, 2026Active
    KC Trade SchoolFeb 5, 2027Nov 2, 2027Active

    Any schedule · any file type · any trade

    DrywallConcreteElectricalMechanicalPlumbingFinishes
    How it works

    From the GC's schedule PDF to a manpower-loaded schedule

    No re-keying, no squinting at a 400-page PDF. Three steps between the schedule you were sent and the crew plan you can staff.

    STEP 01
    PDFXERXMLMPP

    Drop in the schedule

    Upload any schedule file (PDF, XER, XML or MPP) exactly as the GC sent it. No cleanup needed.

    STEP 02

    Set your scope

    Load a trade preset, add your own keywords, or even use your previous Bluebeam markups to identify your scope items.

    STEP 03

    Forecast and export

    Turn the extracted scope into a crew curve, a lookahead, or a clean spreadsheet.

    Tools engineered specifically for subcontractors

    Scope filtering

    Only the work that's yours. Load a curated keyword set for any discipline with trade presets, or scope directly off your Bluebeam markups. Non-matches are flagged unused rather than discarded, so nothing is lost.

    One-click trade presets and suggested keywords
    Negative and exclude keywords to remove noise
    Pull any row back into scope with a toggle
    RESULTSGANTT CHARTEXPORT CSVSAVESAVE ASCOMPARE SCHEDULEGENERATE LOADERTOTAL SCHEDULE LINESMATCHING ACTIVITIESEARLIEST STARTLATEST FINISH969100Jan 30, 2026Nov 20, 2027EXCLUDE AWARD /PROCUREMENT ITEMSFILTERSGROUP BY WBS LEVEL: DEEPEST (LEVEL 4)28 sectionsDrag left to roll deeper sub-areas up into a parent level; drag right to break them back out.Show only the deepest area label100 of 100 shownSHOW UNUSED SCHEDULE ITEMSSELECTACTIVITY IDNAMEAREASTARTFINISHDURATIONKEYWORD⌄UMKC Dormitory › Building Envelope › Building A › Level 31 activityA5730Frame & SheathLevel 319-Jun-2722-Jun-273FRAME⌄UMKC Dormitory › Building Envelope › Building A › Level 41 activityA5790Frame & SheathLevel 403-Aug-2705-Aug-273FRAME
    LABOR IMPACTMETRICCONTRACTREVISIONCHANGEPeak crew3037+7 workersFirst day on siteOct 23, 2026Oct 6, 202617 days earlierLast day on siteMay 29, 2027Apr 15, 202744 days earlierDays on site220193−27 days010203040OctNovDecJanFebMarAprMayContract scheduleRevision

    Schedule comparison

    See exactly what moved. Upload a schedule revision and instantly see added, removed, and changed activities. Purpose-built for revision-to-revision review, so a new issue never catches you off guard.

    Added, removed and changed, side by side
    Day-deltas on every shifted date

    Manpower forecasting

    From scope to a crew loading curve. Build manpower forecasts straight from your scope activities. Assign labor at the line item, activity type, area or whole project level. Adjust jobsite hours and the curve recalculates, tracking OT and DT accumulation as it goes.

    Customizable loader distribution shapes
    Changeable jobsite hours with adaptive OT/DT tracking
    Built for multi-trade companies
    HOURS / DAYCLICK DAY TO TOGGLESET 0 FOR OFFSUN0MON10TUE10WED10THU10FRI10SAT010-HOUR WORKDAYSTOTAL PROJECT LABORDistributed across the whole scope4000BELL CURVETOTAL LABOR4,000 hrsPEAK CREW13AVG CREW7.7WORKDAYS50DAILY CREW HISTOGRAM16 IDLE WORKDAYSOPTIONS048150200400600800CrewCumulative OT HoursJun ’26JulAugSepCUMULATIVE OTCARPENTERSFINISHERS
    PEAK COMBINED CREW25DAILYWEEKLYSTATUSAll statusesTRADEAll tradesFROMWeek of Sep 14, 2026TOEndY-AXIS MAXAutoRESET2 IDLE WEEKS07142128CrewSep ’26OctNovDecJan ’27FebMarAprMayJunJulAugSepOctNovCARPENTERSFINISHERSPROJECTSLincoln Ice RinkACTIVEPeak 13 crew · 8,000 hrsSCHEDULELABOR LOADERUMKC StadiumACTIVEPeak 22 crew · 20,000 hrsSCHEDULELABOR LOADERUMKC Hovde HallACTIVEPeak 9 crew · 10,000 hrsSCHEDULELABOR LOADEROffice TI - Multiple FloorsCOMPLETEDPeak 24 crew · 9,600 hrsSCHEDULELABOR LOADER

    Macro View

    Every project, one histogram. Combine the manpower from all your saved project plans into a single chart, organized by craft to see the mix of total demand and spot company-wide staffing gaps before they become conflicts.

    Toggle between active and bidding jobs
    Daily or weekly granularity

    One manpower loader, every trade

    Concrete, steel, electrical, mechanical, plumbing, drywall, and everything in between.

    Estimators

    Pull your activities out of a huge bid schedule to size crews and understand manpower needs fast.

    Project managers

    Upload the new schedule and instantly see what changed against the baseline.

    Supers & foremen

    Convert your scope into a crew-loading forecast you can actually staff against in the field.

    Construction & precon managers

    Roll every saved project into the Macro View to spot portfolio peaks and resource conflicts.

    Why Labor Loader?

    Manpower loading by hand vs. Labor Loader

    Task
    Finding your scope
    Revision comparison
    Manpower forecast
    Macro View
    Time to a staffed plan
    Labor Loader
    Keyword extraction
    Automatic day-deltas
    Built from your activities
    One histogram
    Minutes
    By hand
    Scrolling a 200-page PDF
    Two windows, side by side
    A spreadsheet you re-key
    Nobody has the whole picture
    Hours, every revision
    30-day free trial, no credit card

    From $69 a month. Viewers are always free.

    Every plan includes every tool: extraction, comparison, manpower loaders and Macro View. You pay only for the people who edit.

    See plans and pricing
    FAQ

    Manpower loading questions, answered

    What is a manpower-loaded schedule?

    A manpower-loaded schedule is a construction schedule where every activity carries the crew size or labor hours needed to build it. Adding those up week by week shows how many workers a trade needs on site over the life of the job. General contractors ask subcontractors for one to check staffing against the dates.

    What does a GC mean by "man-loaded" or "resource-loaded"?

    They mean the same thing: a schedule with labor assigned to each activity. "Man-loaded", "manpower-loaded", "labor-loaded" and "resource-loaded" are used interchangeably in subcontracts and scheduling specs. The GC usually wants to see it as a manpower loading chart, also called a manpower histogram or manpower curve, showing workers per week.

    How do I build a manpower histogram from a P6 PDF without Primavera?

    Upload the schedule PDF the GC sent you. Labor Loader reads the activity table, you pull your scope with trade keywords, then enter a crew size for each activity. The manpower histogram and crew-per-week forecast build as you type, and you can export them. You never need a Primavera P6 license.

    Does Labor Loader work with Microsoft Project schedules?

    Yes. Labor Loader opens native Microsoft Project .mpp files from Project 2010 or later, Microsoft Project XML exports, and schedule PDFs printed from Project. P6 schedules work too, as PDF, XER or XML. An .mpp saved in Project 2007 or earlier cannot be read; ask the GC for a PDF or XML export of that schedule instead.

    Does Labor Loader use AI?

    No generative AI. Reading the schedule PDF, filtering your scope and every crew calculation are ordinary code and arithmetic that run in your browser. Scanned PDFs are read by an open-source text-recognition engine that runs on your own computer using small pre-trained models, like scanner software. Nothing from your schedule is sent to any AI service, and your schedules are never used to train anything.

    Is my schedule uploaded anywhere?

    No. Extraction runs in your browser, so the schedule file is read on your own computer rather than sent to a server for processing. Nothing is stored unless you choose to save the schedule to a project in your account. The free sandbox saves nothing at all.

    How much does Labor Loader cost?

    Plans start at $69 a month, billed annually, for one editor. Team covers up to 5 editors and Business up to 15, and viewers are free on every plan. Every plan includes every tool. Start with a 30-day free trial, no credit card, or try the sandbox without an account.

    Can I compare two schedule revisions?

    Yes. Upload the old and new versions of the schedule and Labor Loader lines them up activity by activity. It shows which activities in your scope were added, removed or changed, and how far start and finish dates moved, so you can see what an update does to your crew plan.

    Which trades does it work for?

    Any trade. Labor Loader ships with keyword presets for framing and drywall, concrete, electrical, plumbing, mechanical, structural steel, roofing, masonry, paint and acoustical ceilings, and you can add your own keywords for anything else. If your work shows up as activities in the schedule, you can pull it out and manpower-load it.

    Stop hunting. Start building.

    Streamline your schedule review process. Find the activities that matter. Filtered, sortable, and ready to forecast.